About us

Trishna Hydro Engineering and Business Company Pvt. Ltd. (THE ABC), officially registered on 6 June 2012 (Registration No: 93738/068/69), is a dedicated company working in the field of engineering and other technical works, especially in alternative energy & rural infrastructure development. THE ABC is a successor company of Surkhet Energy Service Centre (SESC) established in 2001. All the rights and responsibilities have been transferred to THE ABC, which is responsible to carry best quality service and follow the rules and regulations laid down by government and other national bodies without compromising intended quality. We advocate for the sustainable development, believe in adopting appropriate local technology and incorporate latest development in it. We are pre-qualified company by the Alternative Energy Promotion Center (AEPC).

1.1 General Experience (2 Years)

Trishna Hydro Engineering and Business Company Pvt. Ltd. (THE ABC) is currently constructing the Taru Gad Khola Micro-Hydro Project in Matela -8, Bajhang. Production capacity of the Project is 27 kW that will meet power requirement of 236 households. The Project, started in November 2014 following the agreement with Users’ Committee of the Taru Gad Khola, is expected to be completed by April 2016.
THE ABC completed Salyani Ghattekhola MHP (12 kW) in Narakot VDC, Jumla in 2015. In the same year, the company completed Bagida Khola Pico Hydro Power Project of 4 kW in Nirauli VDC of Doti District. It also completed Durga Ghatte Khola MHP (10 kW) in Tamti VDC, Jumla in 2014. Similarly, THE ABC completed another MHP of 8 kW named Ghattekhola in Sanigoun VDC, Jumla in 2014.

1.2 Additional Experience of the THE ABC

In 2012, THE ABC manufactured metallic cooking stoves and supplied to the 200 households in Jumla. In 2013, it manufactured 300 metallic cooking stoves and 150 rocket stoves and supplied to 450 household in Hariharpur and Lekh Parajuli VDCs of Surkhet. Similarly, in 2014, THE ABC constructed 475 improved cooking stoves in Hariharpur VDC. It also supplied and installed Solar Home Systems in 2000 households of Surkhet, Bajura and Jumla districts over the period of 3 years from 2012 to 2014.

1.3 Experience related to the Survey and Feasibility Study

THE ABC conducted site verification of the Taru Gad Khola Micro-Hydro Project being constructed in Matela -8, Bajhang. The site verification of the project was done in March 2014.
The company also conducted detailed feasibility study and construction of Salyani Ghattekhola MHP (12 kW) in Narakot VDC, Jumla in 2015. In the same year, it carried out detailed feasibility study and construction works of Bagida Khola Pico Hydro Power Project of 4 kW in Nirauli VDC of Doti District. Similarly, in 2014, it conducted detailed feasibility study and construction works of Durga Ghatte Khola MHP (10 kW) in Tamti VDC and Ghattekhola MHP of 8 kW in Sanigoun VDC in Jumla District.

Company- General Information

Name of the Organization: Trishna Hydro Engineering & Business Company (Pvt. Ltd.)
(THEBC)
Established: 2069 BS\2012 AD
Areas of operation(districts): Dang, Salyan, Banke, Bradiya, Kailai, Kanchanpur, Jajarkot, Dailekh, Aachhan, Surkhet, Rolpa, Pyuthan, Jumla, Kalicot, Mugu, Homula, Dolpa, Bajhang, Bajuar, Doti, Darchula and Baitadi
Number of general Staff : Fourteen Staff (Ten Males and Two Fe male)
Advisors : Mr. Dipak Gyawali, Nepal Water Conservation foundation.

Dr .Govinda Nepal Professon, patan Multiple College, TU.

Dr. Murali Ranjit: Civil Engineer, ADBTA.

Vision: To promote alternative energy.
Registration No : 93738/068/069
 VAT No : 305480952
Name of the authorized person signing the form : Mohan K. C.
Position Hold in the company : Chairperson/Executive Director